The Contractor should transfer the Northing, Easting and Reduced Level (X,Y and Z respectively) values and Borehole drilling to be taken up after satisfaction of site engineer. The contractor has to provide at the site required surveyor, skilled/unskilled manpower, all the required survey instruments, T&P to the satisfaction of the engineer -in-charge so that the work can be carried out accurately according to the specification and drawings. The contractor shall make his own arrangements for locating the co-ordinates and position of bore holes, trial pits and other field tests as per the drawings/sketches supplied to him. HRIDC will provide the location and Reduced Level (RL) of nearest bench marks.No extra payment will be made for mobilization of plant and machinery and is included in the rate of drilling. The work shall include mobilization of all necessary mechanical/hydraulic rigs inclusive of calyx in required numbers to achieve the progress milestones, with necessary accessories, tools and plants, providing necessary engineering supervision and technical personnel, skilled and unskilled labours, arranging water, drilling fluid, casing for drilling etc as required to carry out the entire field as well as laboratory investigation, analysis and interpretation of test data collected and preparation of a geotechnical report for designing of Embankment, Earth Retaining structures, Minor, Major, Flyover bridges, Station Building and other structures. ![]() The scope of work shall be as below but not limited to: The rates quoted shall remain firm during the entire period of execution till completion of the work and any additional claim for lack of knowledge shall not be entertained. The bidder must visit the site prior to submitting his quotations to acquaint himself fully with the nature, type, scope of work and involvement therein.Preparation of Geotech Investigation Report for Station Buildings and other structures.In the case where bridge location are far away from each other, additional borehole in between has to be carried out so as to meet the codal provisions/guidelines issued by Railways for design of embankment. Geotechnical investigation will be carried out in such a way that, it covers the entire stretch. Preparation of Geotech Investigation Report for design of embankment and Earth Retaining structures.Preparation of Geotechnical Investigation report at minor, major, Flyover bridges along the entire stretch of HORC.The main objective of this work is as under: Date and Time of bid submission: at 5:00 PM to up to 03:00 PM.(HRIDC) has invited bids for Conducting Geotechnical Investigation, preparation of Geotechnical report for designing of Bridges and for Embankment in connection with Construction of Haryana Orbital Rail Corridor (HORC) project from Palwal to Harsanakalan including connectivity to existing IR network in the state of Haryana. The spacecraft will observe the Sun's atmosphere up close with high spatial resolution telescopes and compare these observations to measurements taken in the environment directly surrounding the spacecraft – together creating a one-of-a-kind picture of how the Sun can affect the space environment throughout the solar system.Haryana Rail Infrastructure Development Corporation Ltd. Solar Orbiter will study the Sun, its outer atmosphere and what drives the constant outflow of solar wind which affects Earth. NASA's Launch Services Program is managing the launch.Īs the main driver of space weather, it is essential to understand the behavior of the Sun to learn how to better safeguard our planet, space technology and astronauts. ![]() on a United Launch Alliance Atlas V 411 rocket from Space Launch Complex 41 at Cape Canaveral. For other questions, contact Kennedy's newsroom at 32. 12, 2020.Īll media accreditation requests must be submitted online at:įor questions about accreditation, please email. To attend these activities, international media must apply for credentials by 4:30 p.m. Media prelaunch and launch activities will take place at NASA's Kennedy Space Center in Florida and neighboring Cape Canaveral Air Force Station. 5, 2020, launch of Solar Orbiter – a joint NASA/ESA (European Space Agency) mission that will address central questions concerning our star, the Sun. 16, 2019 /PRNewswire/ - NASA has opened media accreditation for the Feb.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |